Alerts Center
ALT-7839 · monitored
High severityVector B · Hope YoungTeammaintenanceStatus: acknowledged
MRI cooling unit — predictive failure
Helium boil-off rate + compressor vibration signature predict cooling failure in 6.2 days. Service window required.
Asset
Siemens Magnetom 1.5T · MRI-04
Location
Bir Hospital, Kathmandu
Owner
BioMed Ops · Pranita K.
Detected
20702d ago · Dispatch within 48h
Composite Risk Score
Weighted across severity, velocity, blast-radius
78
risk · 100
Severity
Crit
Velocity
Fast
Blast
Wide
Component Health · Predictive Model
Remaining useful life: 6.2 days (P90 confidence)
Compressor41% · MTTF 6.2 days
Cold head58% · MTTF 14 days
Helium reservoir72% · MTTF 21 days
Gradient coil88% · MTTF > 90 days
AI Recommended Playbook
Generated by sovereign-grade decision engine
- 1Schedule compressor service window: 09–11 Jun, off-peak imaging hours.
- 2Pre-position spare cold head from Pokhara depot — ETA 18h.
- 3Reroute non-urgent scans to TUTH MRI-02 (idle capacity 34%).
Event Timeline
- 20702d ago · systemAnomaly detected · vibration signature
- 20702d ago · systemCross-checked with helium telemetry
- 20702d ago · Pranita K.Acknowledged by BioMed Ops
- 20702d ago · Pranita K.Service window proposed
Related Events
Compliance Trail
- Immutable event log written
- Auditor signature attached
- Stakeholder notification
- Post-mortem filed